Deutsch
Cost Calculator · Internal Communications Architecture

How much does your company’s current internal communications architecture cost — per year?

Model calculation based on documented research effect sizes from Gallup Q12, the Engagement Index Germany, the BKK/DAK Health Report and the IAB. Broken down by staff turnover, absenteeism, productivity and healthcare costs — with transparent assumptions and sector-specific benchmarks.

Enter your key details. The calculation is carried out immediately and in real time.

Book an initial consultation →

30 minutes online with Eric Klein, Managing Partner at f3publishing GmbH

Key figures

in euros per year

Your modelled cost impact

Total annual cost impact
— million euros
— % of your staff costs
Excessive staff turnover — million euros
Excessive absenteeism — million euros
Loss of productivity due to an engagement gap — million euros
Rising healthcare and benefits costs — million euros
Total annual cost impact —
Of which can be addressed through an integrated communications architecture (30 %) —
Full-cost steady-state of the integrated architecture (industry-standard range, excluding platform licences) —
Actual investment requirement (incremental additional requirement following a gap analysis — 50 % already covered by existing resources) —
Steady-state refinancing factor (addressable portion ÷ incremental additional requirement following gap analysis — see methodology below)
—
Methodology of investment analysis:
  • Full costs (steady state) = industry-typical range for the integrated architecture (Strategic Internal Communications + Digital Workplace Management + Manager Empowerment + Change Management). Industry ranges derived from the ATD State of the Industry (L&D levels by sector) and ICA Internal Communications Benchmarks. The aggregation is an f3 model calculation — to be refined for specific client cases through a bottom-up analysis of the current situation.
  • Gap analysis = realistic proportion of existing structures (internal communications team, HR/L&D, platform team, change management expertise). Typically 40–70 per cent covered — the incremental additional requirement is the difference, not the full-cost calculation.
  • Set-up surcharge = one-off start-up investment in years 1–2: Initial training for existing management staff (~10 per cent of staff × 2 training days × €400 outlay), concept and architecture design (~0.03 per cent of staff costs), intensive change management set-up (~0.05 per cent of staff costs). Spread over 2 years, after which no further costs are incurred.
  • Not included: Microsoft 365 Basic licences, SharePoint, Teams, Viva Engage, Viva Glint and Power Apps (essential components of the digital workplace, already covered by the IT budget), basic IT infrastructure, one-off platform migration projects.

What are the benefits of a reduction in average sick leave?

Absenteeism is the single biggest lever in most sectors — and the operational metric in which engagement and managerial communication are most directly reflected. Move the slider:

−1 day of sick leave per employee per year
— million euros
— days of sickness absence avoided at group level
1.0 days

A reduction of 0.5 to 1 day recoups the entire annual investment budget for the integrated architecture in many companies — even before staff turnover, productivity and healthcare costs are taken into account.

Receive a detailed PDF report

We will send you a PDF version of your analysis, setting out the methodology transparently, with references and four strategic areas for action — to serve as a basis for discussion at your next board or executive management meeting.

We will use your data solely for the purpose of sending you the report and may contact you if we have any queries regarding its content. Your data will not be passed on to third parties.

Thank you very much! Your enquiry has been received by the consultant. Eric Klein will get back to you shortly.
Note on methodology. This calculation is an illustrative model based on documented research effect sizes (Gallup Q12 — 11th edition, Engagement Index Germany 2024, BKK/DAK Health Report, IAB, DBfK). The sector-specific default values are averages derived from published studies — actual values may vary depending on region, remuneration structure and workforce composition. Before any strategic decision is taken by the executive board, the input values should be reconciled with the actual group key figures. The full methodological framework can be found in the whitepaper ‘Corporate culture is created through communication — not through value posters’ (f3publishing GmbH, June 2026).